  1. Setapp ltd upgrade#
  2. Setapp ltd plus#

  • Home Network module swapping to a different inverter requires support assistance.
  • Switching from SolarEdge Home Network to RS485 requires removal of the SolarEdge Home Network module from the inverter and the inverter’s AC cycle.
  • Setapp ltd upgrade#

    SolarEdge Home Battery firmware upgrade (from SMCU version up to 1.0.26) over RS485 may take around 1 hour.When the battery SoE reaches 100%, it may discharge by a few percent before starting to charge again.In rare cases, SetApp may show incorrect battery power or energy.

    setapp ltd

    Workaround: disconnect and reconnect SetApp to inverter

  • In rare cases, the associated Home Network device may appear under ‘Available Devices’ instead of ‘Installed Devices’ in SetApp (display issue).
  • In some cases, SolarEdge Home battery upgrade fails.
  • Workaround: solve the DC association failure cause and re-associate

    setapp ltd

  • In multiple battery configuration, if one battery fails DC association following batteries will fail as well.
  • In some cases, the battery error LED may light when turning on the battery.
  • Workaround: Reset the communication board or AC power cycle the inverter and upgrade again
  • In some cases, firmware upgrade may fail.
  • Note: Consumption energy data in the Monitoring platform and in mySolarEdge is correct Consumption power measurements works ok when the Inline meter is connected via SolarEdge Home Network.
  • Consumption power is incorrect for the Inline meter connected via RS485 and configured to measure consumption.
  • Display only issue, the trip works correctly.
  • For the grid in Italy - Grid protection setpoint Vgrid max #2 is not displayed correctly after setting it via SetApp.
  • When two batteries are configured, after removing one battery, SetApp may still display both batteries.
  • In rare cases, the communication board switches from the external to the internal Wi-Fi antenna.
  • Also, when battery is charging from DC or AC status will be displayed as standby.
  • Standby status will always be displayed when configured to standby.
  • SolarEdge Home Batteries parallel firmware upgrade via SolarEdge Home Network for reduced upgrade time is now supported by SolarEdge Home Hub inverters.
  • Note: Backup support is pending BUI availability
  • Supports connection of up to two LG Prime batteries via a Combiner box (pending availability).
  • Connection of three SolarEdge Home batteries via Combiner box (pending availability).
  • Direct connection of up to two SolarEdge Home Batteries.
  • SolarEdge Home Hub inverters (SExxxxH-AUSNBBX14) up-to 10kW now support on-grid and backup with following batteries:.
  • Setapp ltd plus#

  • 2 batteries connected to the inverter via the LG RESU Plus Box.
  • Single battery connected directly to the inverter.
  • The Three Phase StorEdge inverter now supports LG RESU 12 batteries with the following configuration:.
  • setapp ltd

    Such a detection stops and locks production accordingly.

  • S-series optimizers now support “SolarEdge Sense Connect” and can detect abnormal temperatures on the optimizer’s connectors when connected to a single-phase SetApp-enabled inverter.
  • Release Notes New Features & Enhancements This requires connecting to the device's Wi-Fi and upgrading the firmware. Improvements included in this version will apply only after the version is updated on the device. To verify the version is updated on the device after the upgrade process, use SetApp to connect to the device, and verify the firmware versions match the tables above (or show higher versions). These firmware versions were released to SetApp packages in May 2022 for all SolarEdge SetApp-enabled devices.